Published on Dec 29, 2012
Norma Schmidt, a registered nurse, speaks to a large crowd in Clinton, Ontario, in September, 2010 about what her health is like, living in the midst of Enbridge’s Kingsbridge wind power project, consisting of 110 wind turbines.
See this link: http://www.cairns.com.au/article/2012/08/02/231251_local-news.html
Another wind farm ignoring the conditions of its planning permit to undertake regular noise compliance testing.
Tears came to my eyes as I have and am still going through exactly the same things as this lady . Here in FNQ Ravenshoe nothing has changed. Monitoring is taking place following a complaint but we all know what the expected result might be. I have suffered for the last 12 years, it gets no better with time.
Colin, I’m sorry to hear you are still suffering, along with so many others. I cannot believe that your complaint made to the responsible local authority 18 months ago has still not been resolved. The turbine operator has still not proved it is complying with its noise permit. The big wind strategy seems to be “drag it out, wear them down and they’ll give up”. Hang in there.